OTHER THINGS

SOME COMPLETED PROJECTS DESERVE SPECIAL MENTION. AS TIME ALLOWS AND AS I SIFT THROUGH FILES THEY WILL GET POSTED HERE. THANKS FOR YOUR PATIENCE.

​LEFT  JUST CLOSE ENOUGH TO AN OVERFLOWING CANAL, THIS ALMOST NEW TUNDRA HAD WATER ENTER INTO THE CAB. WE DID AN EXTENSIVE DETAIL/RECOVERY. STARTING WITH REMOVAL OF EVERYTHING ON AND ATTACHED TO THE FLOOR. CARPETING WAS REMOVED AND CLEANED WITH OUR HOT WATER EXTRACTOR. FLOOR WAS WASHED AND TREATED, ALL WIRING WAS INSPECTED AND PLUGS CLEANED AND LUBRICATED. FOR THE EXTERIOR, THE UNDERCARRIGE WAS THOROUGHLY WASHED AND THE EXTERIOR WAS POLISHED WITH SEALANT APPLIED.

  ...​ALL CLEANED AND READY TO REPLACE        

   

  ​